Westermost Rough Wind Farm is a proposed offshore wind farm to be located 8 km north east of Withernsea off the Holderness coast, in the North Sea, England. The farm will cover an area of approximately 35 km2 with a generation capacity of up approximately 240MW.
The substation for Westermost Rough was placed firmly on the jacket in the beginning of June, 2014. It was a very smooth and a very fast process.
Watch this amazing time-lapse video of the installation process.
Reference: DONGEnergyCorporate